Enjoying our Rockaway coverage?
Add us as a preferred source and our stories show up higher in your Google results.
Add as a preferred sourceBeach Street in Rockaway Borough is open again. The Beach Street Bridge over the Rockaway River reopened on Nov. 9, according to the agenda for the Borough Environmental Commission’s Nov. 19 meeting, after a $1,268,008 Morris County rehabilitation project.
The reopening ends the signed detour of about 1.75 miles that drivers had followed since the bridge closed to through traffic on or about Aug. 13. That detour sent traffic along East Main Street, Jackson Avenue, Union Street and Stickle Avenue, affecting residents who live along Beach Street and anyone who uses it to cross the river.
The county had said the bridge, a single-span steel girder structure built in 1970, was structurally sound, but its concrete driving surface had worn down and years of patching had not stopped potholes from coming back. The project called for Colonnelli Brothers Inc. of Hackensack to replace the deck and to sandblast and repaint the steel girders. The county had projected about three months of work, weather permitting.
The next big bridge job in town is further off. The same Borough agenda lists reconstruction of the East Main Street Bridge in 2030. A community stakeholders meeting on that project was scheduled for Oct. 27, as Rockaway News reported.
What residents can do: drivers can drop the detour and use Beach Street again. Residents who want updates on the East Main Street Bridge can watch the announcements page on the Borough website, where the October stakeholders meeting notice was posted.
Rockaway News first reported the closure in August.


